Shoreline, WA Building Safety: Building Inspections (2026)
Key Facts
- Final inspection
- Signed permit card = certificate of occupancy
- Governing rule
- IRC § R110.3, SMC § 15.05.040
- Work must stay
- Accessible/exposed until approved
- Demolition permit validity
- 60 days, one 60-day extension
- Inspecting official
- City manager or designee (building official)
Summary
In the City of Shoreline, a building permit is not finished until a final inspection is signed off: SMC § 15.05.040 amends the International Residential Code's Section R110.3 so that a dated, authorized signature entered on the permit card under the 'Final' inspection line is itself the certificate of occupancy the code requires. Work stays open to inspection at every stage until the building official closes it out.
R110.3 Certificate issued. An issued permit card affixed with a dated, authorized signature entered under the “Final” inspection shall constitute the certificate of occupancy required by this code.
Full Breakdown
Shoreline layers its own procedural amendments onto the International Residential and Building Codes it adopts under Chapter 15.05 SMC. For one- and two-family construction, SMC § 15.05.040 rewrites Section R110.3 so that the permit card itself, once the building official (the city manager or a designee under SMC § 15.05.020(B)) signs the 'Final' inspection line, stands in as the certificate of occupancy; no separate certificate document is issued. Getting to that final signature requires the work to stay accessible and exposed for inspection at every stage the permit covers, since the standards of the adopted codes are enforced regardless of whether an earlier inspection already passed, and portions that fail an inspection must be corrected and cannot be covered until the inspector authorizes it.
A handful of minor projects skip the inspection cycle entirely: decks no more than 30 inches above grade, re-roofing that does not touch the roof diaphragm, and window replacement that does not change emergency escape openings are exempt from permit under Section R105.2 as Shoreline has amended it. On demolition permits, SMC § 15.05.015 requires the permit holder to request a site inspection once demolition is complete, and the permit itself is only valid 60 days from issuance unless the building official grants a 60-day extension for extenuating circumstances. Every inspection in this chapter is carried out by, or under the authority of, the city's building official.
Violations & Fines
Occupying a structure, or covering work, before the required inspection has been requested and approved is a violation of Shoreline's adopted building codes under Chapter 15.05 SMC. As with other Title 15 violations, the Director can issue a notice and order under SMC § 20.30.760 carrying a $500 civil penalty that escalates 150 percent every 14 days, and a willful violation is a misdemeanor punishable by up to $1,000 and 90 days in jail under SMC § 20.30.770. A demolition permit that lapses without the required final site inspection is void after 60 days unless extended.
Frequently Asked Questions
Does Shoreline issue a separate certificate of occupancy document?
Can I cover work before the city inspects it?
How long is a demolition permit valid in Shoreline?
Sources & Official References
Other rules in Shoreline
Compare Shoreline to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Inspections in Nearby Cities
How other cities in King County handle building inspections.