Brookhaven, GA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Foundation stage
Before concrete, with silt and erosion controls in place
Foundation survey
New single family residences, approved before concrete is poured
Framing (rough)
After wiring and piping are in, before insulation
Inspector entry hours
8:00 a.m. to 7:00 p.m., with consent or warrant
Who requests
Permit holder or agent notifies the building official
Re-inspection
Fee under city council schedule for failed or unready work

Summary

In the City of Brookhaven, Georgia, § 7-170 requires permitted work to stay exposed until the building official approves each stage. Building inspections run from foundation and slab through framing to final, with separate electrical, plumbing, mechanical, gas and energy inspections. Work cannot go beyond an inspection point without approval.

(f)Required inspections. The building official, upon notification, shall make the inspections set forth as follows:(1)Building.a.Foundation and slab inspection. To be made after trenches are excavated, forms are erected, and reinforcement is installed but before concrete is put in place. The appropriate silt and erosion control measures must be in place and functional. ... f.Framing (rough) inspection. To be made after wiring, piping, chimneys, duct and vents to be concealed are in place and all fire blocking is in place. This inspection occurs before any insulation or wall coverings are installed.g.Final inspection. To be made after the building or structure is completed in compliance with this Code and prior to issuance of the certificate of occupancy. ... (o)Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official.

Full Breakdown

Brookhaven Code § 7-170(a) makes all permitted work subject to inspection by the building official and requires it to remain accessible and exposed until approved. The permit applicant carries that duty, and neither the building official nor the city is liable for the expense of removing material to allow inspection. Inspections are performed by the building official or designee, qualified third-party inspectors can be used only with prior written approval, and combination inspections require every affected trade to be ready before the inspection is requested. New construction and demolition also need pre-construction and final site inspections by the city land development inspector under chapter 14.

The building sequence in § 7-170(f)(1) is foundation and slab inspection, before concrete is placed and with silt and erosion controls functional; a foundation survey by a registered land surveyor for new single family residences, approved before concrete is poured; waterproofing, before backfill of crawl space or basement foundation walls; pre-cladding and sheathing; roof felt and sheathing; framing (rough), before insulation or wall coverings; and a final inspection before the certificate of occupancy issues. Electrical and plumbing each have underground and slab, rough-in and final stages, plumbing adds testing under section 312 of the International Plumbing Code, mechanical has underground, rough-in and final, gas has rough-in, final piping with a gas pressure test, and final, and energy has insulation and final.

The permit holder or agent must notify the building official when work is ready and provide safe access. Under § 7-170(o), work cannot proceed beyond the point of each successive inspection without approval, and failed portions must be corrected and stay uncovered until authorized. Re-inspection fees apply under § 7-170(p) when a correction was not made, the job was not ready, the structure was not accessible, work was covered, or a stop work order requires re-inspection. Entry is between 8:00 a.m. and 7:00 p.m. with consent or an inspection warrant issued by a municipal court judge under § 7-171. A certificate of occupancy under § 7-143 waits on the final inspections.

Violations & Fines

Covering or concealing work before approval, or proceeding past an inspection point, triggers correction and a re-inspection fee set by the city council (§ 7-170(p)). Work contrary to chapter 7 draws a stop work order under § 7-62. Violations of chapter 7 are cited to municipal court and carry a fine and/or imprisonment under § 1-11, with each day a separate offense (§ 7-64(c)).

Frequently Asked Questions

What inspections does a new house need in Brookhaven?
Section 7-170(f)(1) lists foundation and slab, foundation survey for new single family residences, waterproofing, pre-cladding and sheathing, roof felt and sheathing, framing (rough), and final inspections. Electrical, plumbing, mechanical, gas and energy work each have their own rough-in or final stages, and the land development inspector adds pre-construction and final site inspections.
Can I cover up work before the inspector arrives?
No. Section 7-170(a) requires work to remain accessible and exposed until approved, and § 7-170(o) says portions that fail must be corrected and not covered or concealed until the building official authorizes it. Covered or concealed work that cannot be inspected also triggers a re-inspection fee under § 7-170(p).
Who schedules the inspection?
The permit holder or the holder's authorized agent. Section 7-170(n) makes it the permit holder's duty to notify the building official when work is ready for inspection and to provide safe access and a safe means for inspection. If the job is not ready when the inspection is requested, a re-inspection fee applies.
When can a city inspector enter my property?
Under § 7-170(q), the building official or designee, on presenting proper credentials, can enter the premises between 8:00 a.m. and 7:00 p.m. if there is consent to enter or an inspection warrant. Under § 7-171, a judge of the municipal court can issue an inspection warrant on the conditions the code lists.

Sources & Official References

Other rules in Brookhaven

All Brookhaven rules

Compare Brookhaven to another location·View the Georgia building safety overview

Get notified when Building Inspections in Brookhaven, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.