Brookhaven, GA Building Safety: Building Inspections (2026)
Key Facts
- Foundation stage
- Before concrete, with silt and erosion controls in place
- Foundation survey
- New single family residences, approved before concrete is poured
- Framing (rough)
- After wiring and piping are in, before insulation
- Inspector entry hours
- 8:00 a.m. to 7:00 p.m., with consent or warrant
- Who requests
- Permit holder or agent notifies the building official
- Re-inspection
- Fee under city council schedule for failed or unready work
Summary
In the City of Brookhaven, Georgia, § 7-170 requires permitted work to stay exposed until the building official approves each stage. Building inspections run from foundation and slab through framing to final, with separate electrical, plumbing, mechanical, gas and energy inspections. Work cannot go beyond an inspection point without approval.
(f)Required inspections. The building official, upon notification, shall make the inspections set forth as follows:(1)Building.a.Foundation and slab inspection. To be made after trenches are excavated, forms are erected, and reinforcement is installed but before concrete is put in place. The appropriate silt and erosion control measures must be in place and functional. ... f.Framing (rough) inspection. To be made after wiring, piping, chimneys, duct and vents to be concealed are in place and all fire blocking is in place. This inspection occurs before any insulation or wall coverings are installed.g.Final inspection. To be made after the building or structure is completed in compliance with this Code and prior to issuance of the certificate of occupancy. ... (o)Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official.
Full Breakdown
Brookhaven Code § 7-170(a) makes all permitted work subject to inspection by the building official and requires it to remain accessible and exposed until approved. The permit applicant carries that duty, and neither the building official nor the city is liable for the expense of removing material to allow inspection. Inspections are performed by the building official or designee, qualified third-party inspectors can be used only with prior written approval, and combination inspections require every affected trade to be ready before the inspection is requested. New construction and demolition also need pre-construction and final site inspections by the city land development inspector under chapter 14.
The building sequence in § 7-170(f)(1) is foundation and slab inspection, before concrete is placed and with silt and erosion controls functional; a foundation survey by a registered land surveyor for new single family residences, approved before concrete is poured; waterproofing, before backfill of crawl space or basement foundation walls; pre-cladding and sheathing; roof felt and sheathing; framing (rough), before insulation or wall coverings; and a final inspection before the certificate of occupancy issues. Electrical and plumbing each have underground and slab, rough-in and final stages, plumbing adds testing under section 312 of the International Plumbing Code, mechanical has underground, rough-in and final, gas has rough-in, final piping with a gas pressure test, and final, and energy has insulation and final.
The permit holder or agent must notify the building official when work is ready and provide safe access. Under § 7-170(o), work cannot proceed beyond the point of each successive inspection without approval, and failed portions must be corrected and stay uncovered until authorized. Re-inspection fees apply under § 7-170(p) when a correction was not made, the job was not ready, the structure was not accessible, work was covered, or a stop work order requires re-inspection. Entry is between 8:00 a.m. and 7:00 p.m. with consent or an inspection warrant issued by a municipal court judge under § 7-171. A certificate of occupancy under § 7-143 waits on the final inspections.
Violations & Fines
Covering or concealing work before approval, or proceeding past an inspection point, triggers correction and a re-inspection fee set by the city council (§ 7-170(p)). Work contrary to chapter 7 draws a stop work order under § 7-62. Violations of chapter 7 are cited to municipal court and carry a fine and/or imprisonment under § 1-11, with each day a separate offense (§ 7-64(c)).
Frequently Asked Questions
What inspections does a new house need in Brookhaven?
Can I cover up work before the inspector arrives?
Who schedules the inspection?
When can a city inspector enter my property?
Sources & Official References
Other rules in Brookhaven
Compare Brookhaven to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.