Brookhaven, GA Building Safety: Plumbing Permits (2026)
Key Facts
- Permit trigger
- Construction, alteration or repair of a plumbing system, except ordinary repairs
- Emergency work
- Permit due within 24 hours after work starts
- Review deadline
- 60 calendar days after a complete application
- Started without permit
- Penalty of 100 percent of the usual permit fee, plus the fee
- Expiration
- 180 days without a passed city inspection
- Administered by
- Community Development Department
Summary
In the City of Brookhaven, Georgia, § 7-118 requires a permit before construction, alteration or repair to a plumbing system, other than ordinary repairs. Stopping leaks, clearing stoppages, and replacing sinks, faucets and water closets without relocating fixtures or piping need no permit. The Community Development Department issues permits and inspects the work.
A permit shall be obtained before beginning construction, erection, alteration or repair to a building or structure, mechanical system, gas system, plumbing system, electrical system, and energy conservation system, other than ordinary repairs. ... Permits shall ... not be required for the following: ... (5)Plumbing.a.The stopping of leaks in drains, water, soil, waste, or vent pipe, provided, however, that if any concealed trap, drainpipe, water, soil, waste, or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered new work and a permit shall be obtained and inspection made as provided in this chapter.b.The clearing of stoppages or the repairing of leaks in pipe, valves, or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.c.Removal and replacement of sinks, lavatories, faucets, and water closets without relocations of fixtures or piping.
Full Breakdown
Under Brookhaven Code § 7-118(a), a permit must be obtained before beginning construction, erection, alteration or repair to a plumbing system, along with buildings, mechanical, gas, electrical and energy conservation systems, other than ordinary repairs. Permits for emergency work must be obtained within 24 hours after work is commenced. The exemption list in § 7-118(d)(5) is narrow. It covers stopping leaks in drains, water, soil, waste, or vent pipe; clearing stoppages or repairing leaks in pipe, valves, or fixtures, including removing and reinstalling water closets, without replacing or rearranging valves, pipes or fixtures; and removing and replacing sinks, lavatories, faucets, and water closets without relocations of fixtures or piping. If a concealed trap or pipe is defective and must be removed and replaced with new material, the code treats that as new work that needs a permit and an inspection.
The application is filed on a form furnished by the Community Development Department. It must describe the work, give the street address and tax parcel ID, state the cost of labor and materials, and list the contractor's company name, state license-holder's name and license number. The building official acts no later than 60 calendar days after a complete application is filed. An application is deemed abandoned 180 days after filing unless a permit has been issued, with up to three written extensions of 90 days each. An issued permit becomes invalid if work has not commenced and passed a city inspection within 180 days. Under § 7-120, a permit is not valid until the fees prescribed by the city council are paid, and under § 7-118(l) the permit or a copy is posted 36 to 48 inches above grade facing the street.
The technical standard is the International Plumbing Code, adopted through § 7-23 as one of the state minimum standards codes. Section 7-25 deletes Chapter 1 of that code and adds a local requirement that all exterior sewer drain clean outs be cut back to finished grade level on all residences. Plumbing inspections under § 7-170(f)(3) are underground and slab, rough-in, final, and testing as required in section 312 of the International Plumbing Code, with tests made by the permit holder and observed by the building official.
Violations & Fines
Starting plumbing work before the permit issues adds a penalty of 100 percent of the usual permit fee on top of the required permit fee (§ 7-118(c)). The building official can issue a written stop work order under § 7-62, and continuing after service brings a municipal court citation. Violations of chapter 7 carry a fine and/or imprisonment under § 1-11, and each day is a separate offense (§ 7-64(c)).
Frequently Asked Questions
Do I need a permit to replace a faucet or toilet in Brookhaven?
How long does the city have to act on a plumbing permit application?
What happens if plumbing work starts before the permit is issued?
What plumbing inspections does Brookhaven require?
Sources & Official References
Other rules in Brookhaven
Compare Brookhaven to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.