Key Facts

Adopted code
International Plumbing Code 2024
Local amendment
Hot water piping capped at 100 ft (Section 607.2)
Permit issued by
Community Development Department
License required
Master/journeyman plumbing license (Section 500.130)
3/4-inch tap fee
$333 plus $3,354 development charge

Summary

Blue Springs enforces the 2024 International Plumbing Code under City Code Section 500.010(A)(4), with one local amendment: Section 607.2 caps the run of hot or tempered water piping at one hundred feet from its source to the fixture. A permit from the Community Development Department is required before any plumbing connection is made to the City's water or sewer system.

4. International Plumbing Code 2024, with a publication date of May 2024, except for the following modification to Section 607.2 of the International Plumbing Code 2024: ... Section 607.2 Hot Or Tempered Water Supply To Fixtures. The developed length of hot or tempered water piping, from the source of hot water to the fixtures that require hot or tempered water, shall not exceed one hundred (100) feet (15,240 mm). Recirculating system piping and heat-traced piping shall be considered to be sources of hot or tempered water. ... Water System Development Charge Schedule Meter Size (inches) Charge 3/4 $3,354 ... Water Tap Fee Schedule Meter Type Meter Size (inches) Charge E-Coder 3/4 $333 ... ... A. No person, firm or corporation shall perform any electrical, mechanical, plumbing, heating and air conditioning or foundation work or contracting in the City of Blue Springs, unless a permit for such work has been obtained from the Community Development Department.

Full Breakdown

The City adopted the International Plumbing Code 2024, publication date May 2024, under Section 500.010(A)(4), locally amending Section 607.2 so hot or tempered water piping cannot run more than one hundred feet from its source to any fixture requiring hot water, while deleting Section 607.2.1 entirely. Before any plumber makes a water, sewer, or plumbing connection, Section 500.070(A) requires a permit from the Community Development Department, and Section 500.130 requires the person doing the work to hold a valid Kansas City or Independence, Missouri master or journeyman plumbing license, or a qualifying Block and Associates test score of at least seventy-five.

Beyond the work permit itself, tapping into City water carries a separate charge under Section 500.035: a water system development charge of $3,354 plus a $333 water tap fee for a standard three-quarter-inch meter, rising as high as $110,184 for a six-inch meter, with parallel sewer system development charges running from $5,312 up to $172,962 depending on meter size. Property owners in the South Area Neighborhood Improvement District receive a credit against the sewer development charge based on prior special assessments. The Codes Administrator, who doubles as the City's Building Official under Section 500.050, oversees permit issuance and fee administration for all plumbing work performed within Blue Springs.

Violations & Fines

Performing plumbing work without the Section 500.070 permit, or without a licensed plumber as Section 500.130 requires, is punishable under Section 500.040's general Building Code penalty: a fine up to the Section 100.080(C) amount, up to ninety days in jail, or both, with each day of a continuing violation counted separately, in addition to the Section 500.130(H) penalty for the licensing violation itself.

Frequently Asked Questions

What plumbing code does Blue Springs use?
The 2024 International Plumbing Code, adopted in Section 500.010(A)(4), with a local amendment to Section 607.2 limiting hot or tempered water piping runs to one hundred feet and deleting Section 607.2.1 in its entirety.
How long can hot water piping run in a Blue Springs building?
No more than one hundred feet from the source of hot or tempered water to the fixtures requiring it, per the local amendment to Section 607.2. Recirculating and heat-traced piping count as sources of hot or tempered water for this measurement.
What does a new water tap cost in Blue Springs?
For a standard three-quarter-inch meter, Section 500.035 sets a $333 water tap fee plus a $3,354 water system development charge; larger meters scale up to $110,184 for a six-inch connection, with separate sewer development charges assessed by meter size.

Sources & Official References

Other rules in Blue Springs

All Blue Springs rules

Compare Blue Springs to another location·View the Missouri building safety overview

Get notified when Plumbing Permits in Blue Springs, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Jackson County handle plumbing permits.

Independence, MO
Some Restrictions
Kansas City, MO
Some Restrictions