Boca Raton, FL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Boca Raton Code Sec. 19-12
Adopted code
Florida Building Code, Plumbing
Code edition
6th Edition (2017), as amended
Additional appendices
Appendix E and F adopted by Sec. 19-5
Permit authority
Building official under Sec. 19-47

Summary

Boca Raton enforces plumbing work through the Florida Building Code, Plumbing, covering installation, alteration, repair and replacement of plumbing systems, equipment, appliances and fixtures, and any water, sewage or medical gas system connection. The building official reviews applications and issues permits before any covered plumbing work begins.

The provisions of the Florida Building Code, Plumbing; fire protection provisions of this building code and FFPC shall apply to the installation, alteration, repair and replacement of plumbing systems, including equipment, appliances, fixtures, fittings and appurtenances, and where connected to a water or sewage system and all aspects of a medical gas system.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 72 Update 1).

Full Breakdown

Section 19-12, titled Plumbing, is the local administrative amendment applying the state-adopted plumbing code to every plumbing installation in the city: the Florida Building Code, Plumbing, together with the fire protection provisions of the building code and the Florida Fire Prevention Code, governs the installation, alteration, repair and replacement of plumbing systems, equipment, appliances, fixtures, fittings and appurtenances, and specifically reaches every aspect of a medical gas system as well as any connection to a water or sewage system. Section 19-5 supplements this by adopting Appendix E and F of the Florida Building Code, Plumbing, by reference.

Section 19-3 fixes the applicable edition at the Florida Building Code, 6th Edition, 2017, as amended, supplemented or replaced by the Florida Building Commission, together with the local administrative rules in Chapter 19; a permit holder under the chapter includes the applicant, contractor, subcontractor, owner and their agents. Section 19-47 assigns the building official responsibility for receiving plumbing permit applications, reviewing construction documents, issuing the permit, inspecting the premises once work is underway, and enforcing the building code's plumbing provisions. Chapter 17's utility rules connect directly to this permitting scheme: Section 17-8 requires any structure connected to the city's wastewater system to also connect to the city's potable water system, and Section 17-1's cross-reference ties plumbing standards in Section 19-12 to the utility connection rules in Chapter 17.

Violations & Fines

Unpermitted or noncompliant plumbing work is enforced as a building code violation: the building official can issue notices and orders under Section 19-48 to compel compliance, and Section 19-7.1 shields the city from tort liability for a hazardous or defective condition in a plumbing system that surfaces after the city's plan review, permitting or inspection, meaning the burden of code compliance stays with the permit holder even after city sign-off.

Frequently Asked Questions

What plumbing code does Boca Raton enforce?
Section 19-12 applies the Florida Building Code, Plumbing, along with the fire protection provisions of the building code and the Florida Fire Prevention Code, to every plumbing installation, alteration, repair and replacement in the city, including medical gas systems and any connection to a water or sewage system.
Do I need a permit to connect new plumbing to the city sewer system?
Yes. Section 19-47 requires the building official to review and issue a permit before plumbing work proceeds, and Section 17-8 separately requires that any structure connected to the city's wastewater system also be connected to the city's potable water system as a condition of that connection.
Which edition of the plumbing code applies to a Boca Raton permit today?
Section 19-3 sets the governing edition as the Florida Building Code, 6th Edition (2017), as may be amended, supplemented or wholly replaced with a new edition from time to time by the Florida Building Commission, together with the local administrative rules in Chapter 19.

Sources & Official References

Other rules in Boca Raton

All Boca Raton rules

Florida rules heatmap·Compare Boca Raton to another location·View the Florida building safety overview

Get notified when Plumbing Permits in Boca Raton, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.