Hoboken, NJ Building Safety: Plumbing Permits (2026)
Key Facts
- Enforcing official
- Plumbing Subcode Official
- Minimum permit fee
- $50
- Sewer tap-in fee
- $90
- Water service (over 2 in.)
- $120
- Fee schedule last amended
- 8-5-2015 by Ord. No. Z-363
Summary
Plumbing installations in the City of Hoboken require a permit from the Plumbing Subcode Official within the Uniform Construction Code Agency. City Code § 86-3C sets a $50 minimum plumbing permit fee with itemized charges for fixtures, water heaters, sewer connections and gas lines.
C. Plumbing Fee Schedule. Plumbing fees shall be as follows: ... Minimum fee $50 ... Sewer tap-in $90 ... Water service To 2 inches $75 Over 2 inches $120
Full Breakdown
The Plumbing Subcode Official is one of the officials the City of Hoboken established within its Uniform Construction Code Agency under § 86-1 to administer the state Uniform Construction Code's plumbing subcode, N.J.A.C. 5:23. Section 86-3C sets the plumbing permit fee schedule: a $50 minimum fee applies to any plumbing permit. Individual fixtures are billed at $15 each, covering a water closet, urinal or bidet, bathtub, lavatory, shower, kitchen or janitor sink, floor drain, drinking fountain, dishwasher, washing machine, gas dryer, kitchen range, garbage disposal and hose bib; a full three-piece bathroom with repiping is billed at $45 and a two-piece powder room with repiping at $30.
Water heaters are billed at $25 up to 50 gallons and $30 above that size, and heating boilers or furnaces are billed at $70 up to 200,000 Btu and $90 above that. A sewer tap-in is billed at $90, a house drain at $50, and a sewerage ejector pump at $60. Water service connections are billed at $75 for pipe up to two inches and $120 for larger pipe, and gas lines are billed at $20 up to two inches and $30 above that. These fees were last amended April 21, 2010 by Ordinance No. Z-34 and August 5, 2015 by Ordinance No. Z-363.
Violations & Fines
Plumbing work performed without the required permit and inspection is enforced under Chapter 86: § 86-5 ties penalties for violating the construction code chapter, including unpermitted plumbing installations, to P.L. 1975, c. 217, § 20 (N.J.S.A. 52:27D-138), enforced by the Construction Official and Plumbing Subcode Official through the Uniform Construction Code Agency.
Frequently Asked Questions
Do I need a permit to replace plumbing fixtures in Hoboken?
How much is a water heater permit in Hoboken?
What does a sewer connection permit cost in Hoboken?
Sources & Official References
Other rules in Hoboken
Compare Hoboken to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.