Boca Raton, FL Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit trigger
- Any fence height, per Sec. 19-66(6)
- Repair exemption
- Under $1,000, no material/height change
- Right-of-way fences
- Need city manager written approval
- Approval status
- Revocable license, not a property right
- Governing sections
- Sec. 19-66 and Sec. 28-1356(d)
Summary
Boca Raton requires a building permit to erect or replace a fence of any height, per Sec. 19-66, and a separate written approval from the city manager or designee before any fence can be built in a public right-of-way or easement under Sec. 28-1356(d).
In addition to the requirements of the Florida Building Code, permits shall be required for the following activities: ... (6)To erect or replace a fence of any height. Wood fences shall be constructed in accordance with Florida Building Code, Building - Section 2328, HVHZ, Wood Fences; and(7)To erect or replace a wall of any height. Walls shall be constructed in accordance with Florida Building Code, Building - Chapter 16.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 72 Update 1).
Full Breakdown
Sec. 19-66 lists work that needs a permit beyond the base Florida Building Code requirements, and item (6) is direct: "To erect or replace a fence of any height. " Item (7) adds the same permit requirement for walls of any height, built to Florida Building Code Chapter 16. There is a narrow repair exception: Sec. 00 from needing a new permit, but any change to materials, width, height, or location voids that exemption regardless of cost. Fences proposed within a public right-of-way, alley, canal, railroad right-of-way, or public easement face an additional layer under Sec.
28-1356(d): no building permit may be issued for such a fence, wall, or structure without prior written approval from the city manager or designee and, where applicable, the agency or utility holding jurisdiction over the easement. That approval is explicitly a revocable license, not a property interest, and the city may revoke it on 30 days' notice, or immediately if the fence is found to create a safety or traffic hazard. A related easement-fence pathway in Sec. " These permit rules were most recently carried forward by Ord. No. 5455, Sec. 2 (5-22-18) for Sec. 19-66 and Ord. No. 5636 (12-13-22) for Sec. 28-1356.
Violations & Fines
Erecting or replacing a fence without the building permit required by Sec. 19-66, or placing a fence in a right-of-way or easement without the city manager's written approval under Sec. 28-1356(d), is a code violation subject to Sec. 1-16's general penalty: a fine up to $500.00, up to 60 days imprisonment, or both, each day a separate offense.
Frequently Asked Questions
Does Boca Raton require a permit for a short residential fence?
Can a homeowner repair a fence in Boca Raton without a new permit?
What extra approval is needed for a fence in a right-of-way?
Sources & Official References
Other rules in Boca Raton
Florida rules heatmap·Compare Boca Raton to another location·View the Florida fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Fence Permit Requirements in Nearby Cities
How other cities in Palm Beach County handle fence permit requirements.