Skip to main content
CityRuleLookup

Jupiter, FL Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Charger type
CHAdeMO and CCS handle required
Minimum power
50 kW rapid charging
Where required
Fueling stations with convenience store/commercial use
Stall option
May use a standard space per § 27-2833
Adopted by
Ordinance No. 44-14, 2015

Summary

Jupiter requires every new or redeveloped automotive fueling station with a convenience store or other commercial use to install and maintain at least one rapid electric vehicle charging station with a CHAdeMO and CCS handle rated at least 50 kW.

(6)Electric vehicle charging station:a.At least one electric vehicle rapid charging station containing a CHAdeMO and Combined Charging Standard (CCS) handle (minimum of 50 kw) shall be installed and maintained at any automotive fueling station with a convenience store or other commercial use.b.The electric vehicle charging station may be located at a standard parking stall which meets the requirements contained in section 27-2833, provided a sign is posted that prohibits parking of vehicles other than those using the electric vehicle charging station.

Full Breakdown

Section 27-2992 sets the land development regulations for every automotive fueling station in Jupiter, and subsection (6) is dedicated to electric vehicle charging. It requires at least one electric vehicle rapid charging station containing a CHAdeMO and Combined Charging Standard (CCS) handle, with a minimum output of 50 kilowatts, to be installed and maintained at any automotive fueling station that includes a convenience store or other commercial use. The charger does not need a dedicated stall built from scratch: subsection (6)(b) lets the town site it at a standard parking stall that already meets the parking design standards in section 27-2833, so long as a sign is posted prohibiting any vehicle from parking there except one actively using the charger.

The requirement sits alongside the rest of Division 37's fueling-station standards, which the town adopted, per section 27-2990, to minimize the impact of fueling stations on surrounding commercial and residential neighborhoods. Those neighboring rules include a 100-foot setback of any fueling position from a residential zoning district or the residential subdistrict of the Mixed Use Development District, and a separate requirement in subsection (7) that every fueling station be prewired with a transfer switch able to run all pumps, dispensers, and safety and payment systems on backup power for at least 72 hours, with a generator operating within four hours of a storm.

The EV charging mandate applies to new construction and redevelopment reviewed under this section; it is a site-plan and building-permit requirement administered by the department of planning and zoning, not a retrofit mandate imposed on stations that predate Ordinance No. 44-14.

Violations & Fines

A fueling station with a convenience store that is newly built or redeveloped without the required rapid EV charging station, or that fails to post the required sign reserving a charger's stall for EV use only, does not meet section 27-2992(6) and cannot receive site plan or building permit approval from the department of planning and zoning.

Frequently Asked Questions

Does every gas station in Jupiter need an EV charger?
Only those with a convenience store or other commercial use that are newly built or redeveloped. Section 27-2992(6) requires at least one rapid EV charging station with a CHAdeMO and CCS handle rated at 50 kW or more at those stations, as part of the town's land development review.
Can a gas station just use a regular parking spot for the EV charger?
Yes. Section 27-2992(6)(b) allows the charger to be placed at a standard parking stall that meets the town's normal parking standards in section 27-2833, as long as a sign is posted restricting that stall to vehicles actively using the charger.
What charging speed does Jupiter require at fueling stations?
A rapid charger rated at a minimum of 50 kilowatts, equipped with both a CHAdeMO handle and a Combined Charging Standard (CCS) handle. Section 27-2992(6)(a) specifies both connector types and the minimum power output for the required station.

Sources & Official References

Other rules in Jupiter

All Jupiter rules

Florida rules heatmap·Compare Jupiter to another location·View the Florida parking rules overview

Get notified when EV Charging in Jupiter, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Palm Beach County handle ev charging.

West Palm Beach, FL
Light Restrictions
Boca Raton, FL
Some Restrictions