Jupiter, FL Parking Rules: EV Charging (2026)
Key Facts
- Charger type
- CHAdeMO and CCS handle required
- Minimum power
- 50 kW rapid charging
- Where required
- Fueling stations with convenience store/commercial use
- Stall option
- May use a standard space per § 27-2833
- Adopted by
- Ordinance No. 44-14, 2015
Summary
Jupiter requires every new or redeveloped automotive fueling station with a convenience store or other commercial use to install and maintain at least one rapid electric vehicle charging station with a CHAdeMO and CCS handle rated at least 50 kW.
(6)Electric vehicle charging station:a.At least one electric vehicle rapid charging station containing a CHAdeMO and Combined Charging Standard (CCS) handle (minimum of 50 kw) shall be installed and maintained at any automotive fueling station with a convenience store or other commercial use.b.The electric vehicle charging station may be located at a standard parking stall which meets the requirements contained in section 27-2833, provided a sign is posted that prohibits parking of vehicles other than those using the electric vehicle charging station.
Full Breakdown
Section 27-2992 sets the land development regulations for every automotive fueling station in Jupiter, and subsection (6) is dedicated to electric vehicle charging. It requires at least one electric vehicle rapid charging station containing a CHAdeMO and Combined Charging Standard (CCS) handle, with a minimum output of 50 kilowatts, to be installed and maintained at any automotive fueling station that includes a convenience store or other commercial use. The charger does not need a dedicated stall built from scratch: subsection (6)(b) lets the town site it at a standard parking stall that already meets the parking design standards in section 27-2833, so long as a sign is posted prohibiting any vehicle from parking there except one actively using the charger.
The requirement sits alongside the rest of Division 37's fueling-station standards, which the town adopted, per section 27-2990, to minimize the impact of fueling stations on surrounding commercial and residential neighborhoods. Those neighboring rules include a 100-foot setback of any fueling position from a residential zoning district or the residential subdistrict of the Mixed Use Development District, and a separate requirement in subsection (7) that every fueling station be prewired with a transfer switch able to run all pumps, dispensers, and safety and payment systems on backup power for at least 72 hours, with a generator operating within four hours of a storm.
The EV charging mandate applies to new construction and redevelopment reviewed under this section; it is a site-plan and building-permit requirement administered by the department of planning and zoning, not a retrofit mandate imposed on stations that predate Ordinance No. 44-14.
Violations & Fines
A fueling station with a convenience store that is newly built or redeveloped without the required rapid EV charging station, or that fails to post the required sign reserving a charger's stall for EV use only, does not meet section 27-2992(6) and cannot receive site plan or building permit approval from the department of planning and zoning.
Frequently Asked Questions
Does every gas station in Jupiter need an EV charger?
Can a gas station just use a regular parking spot for the EV charger?
What charging speed does Jupiter require at fueling stations?
Sources & Official References
Other rules in Jupiter
Florida rules heatmap·Compare Jupiter to another location·View the Florida parking rules overview