Rochester Hills, MI Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Zoning Ordinance § 138-4.404
Charger setback
20 feet from street right-of-way
Accessory chargers
Exempt from fueling-station site standards
Grid review
DTE capacity analysis required
Parking credit
Charging spots count as required parking
Zoning fine schedule
$70/$150/$500 under § 66-37(c)

Summary

Under the Rochester Hills Zoning Ordinance, an EV charging station is a permitted accessory use anywhere else a use is already allowed, so a homeowner or business does not need a separate zoning approval just to add one. A stand-alone automotive fueling station built primarily around EV charging still has to meet the site standards in Section 138-4.404, including a 20-foot right-of-way setback for the chargers and a grid-capacity review from DTE.

A.EV Charging stations that are accessory to an otherwise principal or conditional use shall be considered permissible accessory uses and are not held to the requirements of subsection B below. ... 13.Underground storage tanks, gasoline pumps, EV charging stations and their ancillary equipment, air and water hose stands, and other appurtenances shall be set back not less than 20 feet from all existing and/or proposed street right-of-way lines. ... 15.Fueling positions may be counted as parking spaces for the purpose of determining required parking for the use. ... 17.If the use is primarily for an EV charging facility, the application shall include an analysis and preliminary review by DTE that the City's existing electrical grid infrastructure and capacity is sufficient to supply the proposed use. 18.If the use is primarily for an EV charging facility, space shall be dedicated for those vehicles that may be waiting for a fueling station.

Full Breakdown

Rochester Hills treats electric vehicle charging equipment as an accessory use wherever it serves a principal or conditional use already approved on the site, so property owners installing a charger for their own building don't trigger the fueling-station standards in Zoning Ordinance Section 138-4.404 at all. Those standards only kick in when EV charging is the primary use of a site, and they're detailed: the property must sit at the intersection of two arterials or freeways with at least a 120-foot right-of-way, carry a minimum one-acre lot with 100 feet of frontage, and provide a 2,000-square-foot indoor retail component.

Chargers, pumps and their ancillary equipment must be set back at least 20 feet from every street right-of-way line, and fueling positions have to be laid out so no cord or hose crosses a sidewalk. Entrances and exits must sit at least 35 feet from any right-of-way line and 50 feet from a residential district. If chargers are visible from a nearby residential district, the Planning Commission can require a Type C landscape buffer under Section 138-12.300, and all ground-mounted transformers and chargers along parking-area edges must be fully screened.

Before a primarily EV-charging site plan is approved, the applicant must submit DTE's preliminary review confirming the City's electrical grid has capacity for the load, and the layout must dedicate space for vehicles waiting to charge. Fueling positions, including charging spots, count toward the site's required off-street parking total, and the Fire Department reviews every application for its ability to respond to an on-site emergency.

Violations & Fines

The zoning ordinance itself sets no separate fine for Section 138-4.404; a violation is enforced as any other zoning infraction under the city's schedule of civil fines. Section 66-37(c) lists 'Zoning' violations under Code Section 138-7 at $70 for a first violation, $150 for a first repeat, and $500 for a second or subsequent repeat violation, issued by the city's Planning and Economic Development Department or the ordinance violations bureau.

Frequently Asked Questions

Do I need a zoning permit to add an EV charger to my house or business in Rochester Hills?
No. Section 138-4.404(A) treats a charging station as an accessory use whenever it serves a principal or conditional use already permitted on the property, so it isn't held to the automotive fueling station site standards that apply to a dedicated EV charging business.
How close to the street can EV chargers be installed at a commercial fueling station?
Not closer than 20 feet. Section 138-4.404(B)(13) requires underground tanks, gasoline pumps, EV charging stations and their ancillary equipment to be set back at least 20 feet from every existing or proposed street right-of-way line, the same setback that applies to the fueling positions themselves.
Do EV charging spaces count toward a business's required parking in Rochester Hills?
Yes. Section 138-4.404(B)(15) allows fueling positions, including EV charging spots, to be counted as parking spaces when calculating the required parking for the use, so a station doesn't need extra spaces on top of its chargers.

Sources & Official References

Other rules in Rochester Hills

All Rochester Hills rules

Compare Rochester Hills to another location·View the Michigan parking rules overview

Get notified when EV Charging in Rochester Hills, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Oakland County handle ev charging.

Farmington Hills, MI
Light Restrictions