Woodland, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Woodland Municipal Code § 17.68.060
51+ space lots
EV stations for 6% of total spaces
10-25 space lots
One EV charging space required
Minimum EVSE level
Level 2 or higher
Accessible EV space
Van-accessible dimensions, built first
Public station sign limit
4 sq ft, 8 ft height, nonilluminated
Exceptions
Insufficient power or housing hardship only

Summary

New buildings in the City of Woodland, California must install electric vehicle charging spaces under Woodland Municipal Code § 17.68.060, with minimums scaled to a project's total required parking: none under 10 spaces, one for 10 to 25, two for 26 to 50, and 6% of the total for 51 or more. The Planning and Building Director and Building Official may waive the standard only for insufficient electrical supply, adverse utility infrastructure cost impacts, or affordable-housing economic hardship.

§ 17.68.060. Electric Vehicle Charging Stations. Electric vehicle (EV) charging stations and EV-capable parking spaces shall be provided for all new buildings erected as required by this section. ... A. Required EV Charging Stations. The total number of required EV charging stations spaces are specified in Table 17.68.060.A-1: Required EV Charging Spaces.

Table 17.68.060.A-1: Required EV Charging Spaces Total Number of Required Parking Spaces Minimum EV Charging Spaces ... 51+ 6% of total

B. Exceptions. Exceptions to Table 17.68.060.A-1: Required EV Charging Spaces may be made on a case-by-case basis where the Planning and Building Director and the Building Official determine that EV charging infrastructure is not feasible based upon one or more of the following conditions: ... E. EV Charging Stations. EV charging stations shall be allowed within any zone subject to all applicable requirements of the Municipal Code in addition to the following: ... 8. EV Stations for Public Use. EV charging stations for public use must be visible from the right-of-way and illuminated during nighttime business hours.

Full Breakdown

Section 17.68.060 folds EV parking into the site's overall on-site parking count under § 17.68.030, so a project's EV total is calculated from its regular parking demand, not added on top. The table sets four tiers: 0 to 9 required spaces need no EV stations; 10 to 25 spaces need one; 26 to 50 spaces need two, whether the use is residential or nonresidential; and any lot with 51 or more required spaces must provide EV stations equal to 6% of the total. Subsection C sends the size of EV and EV-capable spaces to § 17.68.090, Parking Area Development and Design Standards, and specifies that the EV supply equipment itself cannot shrink the stall.

Subsection D requires at least one EV space with van-accessible dimensions under the California Building Code where accessible parking is required, and that space must be the first EV station built on the property, though its curb cannot carry accessible pavement markings. Subsection E layers on construction and equipment rules: charging construction must meet California Green Building Standards Code sections 5.106.5.3.1 and 5.106.5.3.2, the supply equipment (EVSE) must be Level 2 or higher, chargers must be listed and labeled by an approved testing agency, and the installation cannot conflict with existing infrastructure or create pedestrian or vehicular hazards, with any affected trees identified in advance.

Stations open to the public must be visible from the right-of-way, lit during nighttime business hours, and may carry a single nonilluminated identification sign up to four square feet and eight feet tall; each public station must post its voltage and amperage, hours of enforcement, usage fee, safety information, and a contact for reporting malfunctions.

Violations & Fines

Woodland Municipal Code has no charging-specific fine; a missing or undersized EV installation is enforced through Community Development's building permit review and, if unresolved, the code's general penalty at § 1.08.070: a misdemeanor punishable by up to six months in County Jail or a $1,000 fine, or prosecution as an infraction carrying $100 for a first offense, $200 for a second within a year, and $500 after that. The City may also issue administrative citations under Chapter 9.20, and each day of noncompliance counts as a separate offense.

Frequently Asked Questions

How many EV charging spaces does a new building in Woodland need?
Woodland ties the EV count to a project's total required parking under § 17.68.060: no EV spaces for 9 or fewer required spaces, one space for 10 to 25, two spaces for 26 to 50, and 6% of the total once a project needs 51 or more parking spaces. Community Development pulls the count from the same table used for the base parking calculation.
Can a Woodland project skip the EV charging requirement?
Only through a case-by-case exception under § 17.68.060(B). The Planning and Building Director and Building Official can waive stations if electrical supply is insufficient, if utility infrastructure upgrades would substantially raise construction costs, or if the requirement creates an economic hardship for an affordable housing project. There is no general opt-out for market-rate commercial or residential development.
What must a public EV charging station in Woodland post?
Section 17.68.060(E)(8) requires voltage and amperage levels, hours of operation if time limits or towing are enforced, the usage fee, safety information, and a contact for reporting malfunctions. Public stations must also stay visible from the right-of-way and lit during nighttime business hours, and may carry one nonilluminated identification sign up to four square feet and eight feet tall.
What charger type does Woodland require?
EV parking spaces must be equipped with electric vehicle supply equipment (EVSE) rated Level 2 or higher under § 17.68.060(E)(2), and any charger must be listed and labeled by an approved testing agency. Construction must also comply with California Green Building Standards Code sections 5.106.5.3.1 and 5.106.5.3.2 to keep future EVSE installation feasible.

Sources & Official References

Other rules in Woodland

All Woodland rules

California rules heatmap·Compare Woodland to another location·View the California parking rules overview

Get notified when EV Charging in Woodland, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Yolo County handle ev charging.

West Sacramento, CA
Some Restrictions