Wisconsin Statewide Rule
Wisconsin Stormwater Discharge and NR 151 Standards
Key Facts
- Code
- NR 151 / Wis. Stat. 281.33
- Permit threshold
- 1+ acre disturbed
- TSS reduction
- 80 percent new sites
- Max forfeiture
- $10,000 per day
Summary
Wisconsin's NR 151 sets statewide performance standards for construction site and post-construction stormwater runoff. DNR administers WPDES permits, and local programs must meet or exceed state minimums.
For construction sites for which the department received a notice of intent for the construction project in accordance with subch. III of ch. NR 216, 2 years or more after January 1, 2011, BMPs that, by design, discharge no more than 5 tons per acre per year, or to the maximum extent practicable, of the sediment load carried in runoff from initial grading to final stabilization.
Full Breakdown
Wis. Stat. section 281.33 and Wis. Admin. Code NR 151 establish runoff management standards applicable to construction sites disturbing one acre or more, municipal separate storm sewer systems (MS4s), and certain land uses. Post-construction sites must reduce total suspended solids by 80 percent for new development. Construction operators must obtain a WPDES general permit, install erosion controls, and submit stormwater management plans. Municipalities designated as MS4s must implement six minimum control measures, including public education, illicit discharge detection, and post-construction controls. Local rules may be stricter but must satisfy NR 151 baselines.
Violations & Penalties
DNR may issue notices of violation, daily forfeitures up to $10,000 under Wis. Stat. 281.98, stop-work orders, and require remediation of unauthorized discharges.
Frequently Asked Questions
When is a stormwater permit required in Wisconsin?
Do these rules apply on private property?
Can my city require stricter stormwater controls?
Sources
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.