Key Facts

Governing section
§ 6.02.052(17)
Applies to
All building/construction jobsites citywide
Containment options
Dumpster, roll-off, or mesh fence
Mesh limit
4-inch sphere cannot pass through
Temp dumpster material
1/2-inch OSB or equivalent
Adopted with
2018 International Building Code amendments

Summary

Hutto's building code amendments require construction debris on every jobsite in the city to be contained in dumpsters, roll-off containers, or a fenced area with mesh no wider than four inches, so trash cannot blow off site during a project.

(17) Construction debris on all building and construction jobsites within the corporate limits of the City shall be contained with either dumpsters, roll-off containers or a wire mesh fenced area with a mesh that a four inch sphere cannot pass through. A temporary dumpster sturdily constructed of one-half inch oriented strand board (OSB) or equivalent material may also be used. The owner, contractor and all other persons on the building or construction job site shall take all reasonable measures to prevent trash or construction debris from being blown out of a dumpster, container or other confined area.

Full Breakdown

Section 6.02.052, the city's amendments to its adopted International Building Code, adds jobsite-management rules at item (17): construction debris on all building and construction jobsites within the corporate limits of the city must be contained using dumpsters, roll-off containers, or a wire-mesh fenced area whose openings are small enough that a four-inch sphere cannot pass through. A temporary dumpster is permitted if it is sturdily constructed of one-half inch oriented strand board (OSB) or equivalent material. The same item places the duty broadly on everyone at the site: the owner, contractor and all other persons on the job site must take all reasonable measures to prevent trash or construction debris from being blown out of a dumpster, container, or other confined area, so wind-blown debris escaping an otherwise-compliant container can still trigger a violation if reasonable precautions were not taken.

The requirement sits alongside other jobsite conditions in the same amendment: item (16) requires a clear, accessible path free of construction debris or equipment for inspectors and workers, item (18) requires operating erosion controls for the duration of the permit, and item (19) requires OSHA-compliant fall protection. Because these are conditions attached to the building permit under division 2 of article 6.02, Development Services building inspectors can cite noncompliance during a routine inspection, and unresolved violations are enforceable under the citywide general penalty in section 1.01.009.

Violations & Fines

Failing to keep jobsite construction debris contained in a dumpster, roll-off container, or mesh-fenced enclosure, or letting debris blow off site, violates the section 6.02.052(17) building permit condition, exposing the owner or contractor to code enforcement action and the general penalty in section 1.01.009, up to $500, with each day of an uncorrected condition a separate offense.

Frequently Asked Questions

Do Hutto contractors have to use a covered dumpster on a jobsite?
The code does not require a lid, but section 6.02.052(17) requires debris to be contained in a dumpster, roll-off container, or a wire-mesh fenced area with openings no larger than four inches, and it requires reasonable measures to stop debris from blowing out.
Can a contractor build a temporary dumpster instead of renting one?
Yes. Section 6.02.052(17) allows a temporary dumpster in place of a rented one, as long as it is sturdily built from one-half inch oriented strand board (OSB) or an equivalent material strong enough to contain construction debris on the jobsite.
What other jobsite conditions come with this rule?
The same building code amendment requires a clear, unobstructed path for inspectors and workers under item (16), operating erosion controls for the life of the permit under item (18), and OSHA-compliant fall protection under item (19), all enforced as conditions of the building permit.

Sources & Official References

Other rules in Hutto

All Hutto rules

Texas rules heatmap·Compare Hutto to another location·View the Texas trash & recycling overview

Get notified when Dumpster Rules in Hutto, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Dumpster Rules in Nearby Cities

How other cities in Williamson County handle dumpster rules.

Cedar Park, TX
Some Restrictions