Grand Forks, ND Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

No-permit penalty
Equals regular fee, once project hits $2,000
Trigger
Project value $2,000+ or court complaint
Contractor requirement
License plus $5,000 performance bond
Bond duration
Held 1 year past certificate of occupancy
Homeowner exception
Own-residence work needs no license or bond

Summary

Grand Forks requires a building permit before work that reaches the thresholds in City Code § 19-0101 item (18): starting without one triggers a penalty fee equal to the regular permit fee once a project hits $2,000 in value or draws a Municipal Court complaint. Section 19-0103 further requires the contractor's license and a $5,000 bond before permitted work can proceed.

(18)109.4. Add the following after the last sentence: ... "A penalty fee shall be paid if work is commenced without first obtaining a permit and the following apply: a) the project is valued at $2,000 or more, or b) any project in which a formal complaint has been made to Municipal Court. This penalty fee shall be equal to the fee of the building permit." ... 19-0103. - Performance bond required. (1)No person, firm, or corporation shall erect, construct, enlarge, alter, demolish, repair, improve or convert any building or structure for which a building permit is required until such person, firm, or corporation engaged in the business of construction, repair, alteration, dismantling, or demolition shall have obtained a contractor's license from the city and the state and shall have furnished and filed a performance bond in the sum of five thousand dollars ($5,000.00) made payable to the city with good and sufficient sureties to be approved by the city auditor, conditioned that such person, firm, or corporation will faithfully comply with all city building codes, zoning regulations and ordinances governing the work necessary as set forth in said building permit(s).

Full Breakdown

Section 19-0101 amends the adopted International Building Code with dozens of numbered local changes, and item (18) adds language directly to 109.4: "A penalty fee shall be paid if work is commenced without first obtaining a permit and the following apply: a) the project is valued at $2,000 or more, or b) any project in which a formal complaint has been made to Municipal Court. This penalty fee shall be equal to the fee of the building permit." That penalty stacks on top of the ordinary fee, and "both the penalty and regular permit fee must be paid before work is restarted," so starting early on a $2,000-plus job effectively doubles the fee owed.

Section 19-0103(1) separately conditions any permitted erect, construct, enlarge, alter, demolish, repair, improve, or convert activity on the contractor first holding "a contractor's license from the city and the state" and filing "a performance bond in the sum of five thousand dollars ($5,000.00)" approved by the city auditor. That bond is not released for a full year after a certificate of occupancy issues for work begun in the bond's calendar year. Section 19-0103(2) exempts governmental entities already excused from the § 19-0102 permit fee, and "any individual working on said individual's own residence," from the license-and-bond step, though the standard permit fee set by council resolution under item (17) 109.2 still applies to that homeowner's own project.

Violations & Fines

Beginning work before obtaining the required permit exposes the responsible party to the § 19-0101 item (18) penalty fee, equal to the regular building permit fee, once the project reaches $2,000 in value or a Municipal Court complaint is filed; both fees must be paid before work resumes. Working without the § 19-0103 contractor's license and bond is separately enforced under the Article 1 penalty at § 19-0122, up to $1,000 per day.

Frequently Asked Questions

Is there a penalty for starting building work in Grand Forks without a permit?
Yes, once you cross a threshold. City Code § 19-0101 item (18) adds a penalty fee, equal to the regular permit fee, that applies if work starts without a permit and the project is valued at $2,000 or more, or if a formal complaint about the work reaches Municipal Court.
How much extra does it cost to get caught building without a permit?
Both fees must be paid before work can resume: the regular building permit fee and the added penalty fee, which item (18) of § 19-0101 sets equal to that regular fee, so starting a $2,000-plus job without a permit effectively doubles the fee owed once caught.
Does a homeowner need a contractor's license and bond for their own house?
No. Section 19-0103(2) exempts "any individual working on said individual's own residence" from the contractor's license and $5,000 performance bond that § 19-0103(1) otherwise requires, though the homeowner still owes the standard permit fee the City Council sets by resolution.

Sources & Official References

Other rules in Grand Forks

All Grand Forks rules

Compare Grand Forks to another location·View the North Dakota building safety overview

Get notified when Building Permits in Grand Forks, ND changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.