Key Facts

Adopted code
Latest NEC / NFPA 70, ND Electrical Board standards
Pre-work step
Plans filed and approved, § 19-0210
Contractor license
Annual city license, expires December 31
Certificate threshold
$300+ installations need ND wiring certificate
Penalty
Up to $1,000 per day, § 19-0224

Summary

Grand Forks adopts "the latest edition of the National Electrical Code" and North Dakota's electrical standards by reference at City Code § 19-0208, and before any electrical installation begins, § 19-0210 requires the contractor to file complete plans and specifications with the city engineering office for approval, the city's functional equivalent of an electrical permit.

19-0208. - Adoption of National Electrical Code and state standards. (1)The latest edition of the National Electrical Code, American National Standards, NFPA No.70 and the rules, regulations, and standards as promulgated and adopted by the North Dakota State Electrical Board be and are hereby adopted and incorporated herein by reference to coincide with the state's adoption date.(2)Three (3) copies of said code shall be maintained on file with the city engineer. ... 19-0210. - Plans required. (1)Prior to the commencement of electrical installations, complete plans and specifications of the proposed electrical installation shall be filed with and approved by the city engineering office.

Full Breakdown

The electrical code lives in Chapter XIX, Article 2, established at § 19-0201 to "regulate the installation of all electrical conductors, fittings, devices, fixtures, and appliances" in the city. Section 19-0208 adopts by reference "the latest edition of the National Electrical Code, American National Standards, NFPA No.70 and the rules, regulations, and standards as promulgated and adopted by the North Dakota State Electrical Board," timed "to coincide with the state's adoption date," with three copies required to be kept on file with the city engineer.

Rather than issuing a document labeled a permit, Grand Forks uses a plan-approval step: § 19-0210 requires that "complete plans and specifications of the proposed electrical installation shall be filed with and approved by the city engineering office" before work starts, with at least two corrected sets filed if the first submission needs revision, and one approved set kept "at such building or work at all times during which the work authorized is in progress." Any electrical firm doing city work must also hold an annual "Grand Forks city electrical contractor's license" under § 19-0220, issued for a council-set fee and expiring December 31 each year, and installations worth "three hundred dollars ($300.00) or more" separately require a North Dakota State wiring certificate under § 19-0222.

The city electrical inspector created at § 19-0206 must be a state-licensed master electrician and administers both the plan approval and the resulting field inspections under this article.

Violations & Fines

Section 19-0224 sets the Article 2 penalty at up to $1,000 for violating "any of the terms or provisions of this article," with each day of a continuing violation a separate offense; the electrical inspector can also disconnect service to non-compliant equipment under §§ 19-0214 and 19-0215, and the city electrical board can revoke a contractor's license under § 19-0211 for cause after a hearing.

Frequently Asked Questions

Does Grand Forks require a permit before electrical work starts?
The city uses a plan-approval step instead of a document called a permit. Section 19-0210 requires complete plans and specifications of the proposed electrical installation to be filed with and approved by the city engineering office before work begins on the project.
Which electrical code does Grand Forks enforce?
Section 19-0208 adopts by reference the latest edition of the National Electrical Code, NFPA No. 70, and the standards of the North Dakota State Electrical Board, timed to the state's own adoption date, with three copies kept on file with the city engineer for reference.
What happens if electrical work in Grand Forks fails an inspection?
Under § 19-0215, the electrical inspector orders corrections within a set time and can disconnect or order disconnection of any defective or improperly installed equipment that hazards life or property until repairs are made and it is reapproved by the inspector.

Sources & Official References

Other rules in Grand Forks

All Grand Forks rules

Compare Grand Forks to another location·View the North Dakota building safety overview

Get notified when Electrical Permits in Grand Forks, ND changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.