Dublin, CA Building Safety: Green Building Code (2026)
Key Facts
- Governing chapter
- DMC Ch. 7.94, Ord. 8-25 (2025)
- All-electric mandate
- New construction, Section 4.106.5.1
- EV charging
- Mandatory Tier 1, Section A4.106.8
- Concrete carbon penalty
- $190 per excess metric ton CO2e
- Enforcing office
- Building and Safety Division, 100 Civic Plaza
Summary
Dublin adopts the 2025 California Green Building Standards Code by reference and layers on local amendments: new buildings must be all-electric, EV charging is mandatory at Tier 1, and concrete must meet embodied-carbon limits enforced by the Building and Safety Division.
A. The 2025 California Green Building Standards Code, Part 11, Title 24 of the California Code of Regulations, a portion of the California Building Standards Code, as defined in the California Health and Safety Code Section 18901 et seq. (hereinafter referred to as the "state code"), and any rules and regulations promulgated pursuant thereto, as referenced in and adopted pursuant to California Health and Safety Code Sections 17922 and 18935, are hereby adopted and incorporated by reference herein. ... B. Notwithstanding the provisions of subsection A of this section, the state code is amended as set forth in Sections 7.94.050 through 7.94.080.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2-26, passed March 3, 2026).
Full Breakdown
030 and then amends it locally. 070, makes new construction and "qualifying alteration" projects (additions removing 50% or more of exterior walls, or adding more than 50% of floor area) all-electric buildings unless the Building Official grants a modification because no all-electric compliance pathway exists. 060, replaces the state EV-charging standard and makes charging infrastructure mandatory at Tier 1 for new construction. 1 requires a one-inch conduit run to the solar zone for future solar access. 085, imposes a Low Carbon Concrete standard capping cement content and embodied carbon per project, verified through a Low-Carbon Concrete Compliance Form filed with the Building and Safety Division before permit approval and again with batch certificates before pouring.
All these amendments were enacted by Ord. 8-25 § 12 (Exh. 94, retaining the low-carbon concrete provisions originally added by Ord. 9-24 § 10. Copies of the adopted codes are on file at the Office of the Building Official, 100 Civic Plaza. Exemptions from the concrete rule exist for shotcrete, gunite, stucco, permit-exempt projects, and a hardship/infeasibility process the Building Official decides within 60 days.
Violations & Fines
Excess embodied carbon in concrete triggers a penalty computed as Pm = (ECx)($190) plus the Building and Safety Division's administrative fee under the City's Master Fee Schedule, where ECx is the excess carbon in metric tons. Failure to submit the compliance form or batch certificates before pouring can hold up further inspections. Projects lacking an approved all-electric compliance pathway or EV-charging infrastructure will not receive final building permit sign-off from the Building Official.
Frequently Asked Questions
Does Dublin require new homes to be all-electric?
What green code edition does Dublin use?
Is there a penalty for exceeding concrete carbon limits?
Sources & Official References
Other rules in Dublin
California rules heatmap·Compare Dublin to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.