Lynwood, CA Building Safety: Green Building Code (2026)
Key Facts
- Diversion requirement
- 65% of C&D debris diverted from landfills
- Covered project threshold
- 1,000 sq ft addition or $200,000 alteration
- Recycling fee deposit
- 1-2% of job value, refundable
- Enforcing agency
- Lynwood Public Works Director
- Appeal window
- 30 days to city council, § 9-6.6
Summary
In the City of Lynwood, covered construction and demolition projects must divert at least 65 percent of nonhazardous debris from landfills under the city's CALGreen-based waste diversion ordinance. Nonresidential permits, additions of 1,000 square feet or more, and $200,000-plus alterations qualify as covered projects, requiring a city-approved waste management plan and diversion documentation before a permit issues under Lynwood Municipal Code §§ 9-6.2 and 9-6.3.
a. Diversion: ... At least sixty-five percent (65%) of all nonhazardous construction, demolition, concrete, and asphalt generated by any covered project shall be diverted from landfills by recycling and/or salvaging for reuse in accordance with either section 4.408.2, 4.408.3, or 4.408.4 (and 4.408.4.1) of the California Green Building Standards Code. The applicant shall provide the city with documentation of diversion. ... ... b. Certificates of occupancy on a project shall not be withheld due solely to the failure of a project to achieve the diversion requirements of this subsection. c. Recycling by Occupants: In addition to meeting the provisions of this subsection, and pursuant to section 4.410.2 of the Green Building Code, covered projects with five (5) or more multifamily dwelling units constructed on a building site shall provide readily accessible area(s) that serves all buildings on the site and is identified for the depositing, storage, and collection of nonhazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals.
Full Breakdown
The City of Lynwood's Community Development Department enforces the Construction and Demolition (C&D) Waste Management chapter, which implements the California Green Building Standards Code (CALGreen) locally. A covered project, defined in § 9-6.2 as a nonresidential new-construction or demolition permit, an addition of 1,000 square feet or more, or an alteration valued at $200,000 or above, must divert at least 65 percent of its nonhazardous construction, demolition, concrete, and asphalt waste from landfills, per § 9-6.3. Applicants must submit a waste management plan (WMP) to the director of public works for written approval before a building permit issues, identifying diversion facilities, sorting methods, and construction methods used to cut waste.
Low-rise residential projects meet the standard automatically if landfilled debris does not exceed 3.4 pounds per square foot of building area; high-rise and nonresidential projects qualify at 2 pounds per square foot, per § 9-6.4. As a condition of permit approval, applicants must post a recycling fee deposit of 2.0 percent of job value for jobs between $100,000 and $499,999, or 1.0 percent for jobs of $500,000 or more, plus a separate C&D fee under the city's master fee schedule. The deposit is refunded in proportion to the diversion percentage actually achieved and can be forfeited for noncompliance.
Covered projects with five or more multifamily units must also provide accessible recycling areas for paper, cardboard, glass, plastics, organic waste, and metals under § 9-6.3(c). A denied or incomplete WMP can be appealed to the city council within 30 days by filing a written statement with the city clerk under § 9-6.6.
Violations & Fines
Failing to submit or gain written approval of a waste management plan before starting work, or failing to meet the 65 percent diversion target without an approved infeasibility exemption, blocks permit issuance and can forfeit some or all of the posted recycling fee deposit. The director of public works may deny the WMP outright or return it marked 'Further Explanation Required,' and certificates of occupancy may be withheld until compliance documentation, including weight tags and recycling receipts, is submitted under § 9-6.5.
Frequently Asked Questions
Does Lynwood require a waste management plan for home remodels?
How much is Lynwood's recycling fee deposit?
What happens if a Lynwood project can't reach 65% diversion?
Sources & Official References
Other rules in Lynwood
California rules heatmap·Compare Lynwood to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in Los Angeles County handle green building code.