Beaumont, CA Building Safety: Building Inspections (2026)
Key Facts
- First inspection, unpermitted work
- Within 30 calendar days of permit issuance
- Remaining inspections
- Within 30 days after the initial inspection
- Extension
- One extension of up to 30 calendar days
- Investigation fee
- Equal to the permit fee
- Application expiry
- 12 months without a permit issued
- Permit expiry
- 12 months to start; 365 days suspended
Summary
In the City of Beaumont, California, Municipal Code § 15.04.020 amends the California Building Code so that work started without a permit must get its first inspection within 30 calendar days of permit issuance. Re-inspection fees can be assessed when work is not ready or corrections are not made.
105.5.1 Work Commenced Without Permit. Where work for which a permit is required by this code is commenced without first obtaining a permit, when subsequently issued, the permit, shall be subject to the following provisions: 1.Initial Inspection Deadline: Within 30 calendar days of the issuance of the permit, the permittee shall request and obtain the first inspection corresponding to the state of construction completed prior to permit issuance.2.Subsequent Inspections. The permittee shall request and obtain all other required inspections that would have been required at earlier stages of work withing 30 calendar days following the initial inspection. ... 109.5 Related fees. ... A re-inspection fee may be assessed for each inspection or re-inspection when such portion of work or which inspection is called is not complete or when corrections called for are not made. It is not the intent to require re-inspection fees the first time a job is rejected for failure to comply with the requirements of this code, but as controlling the practice of calling for inspections before the job is ready for such inspection or re-inspection.
Full Breakdown
The Building & Safety Department, created by Section 103.1 of the Building Code as amended in Municipal Code § 15.04.020, implements and enforces the code under the building official. The local text does not list individual inspection stages. It adopts Chapter 1, Division II of the 2025 California Building Code (§ 15.04.010) and amends the administrative provisions.
For work commenced without a permit, Section 105.5.1 sets a strict schedule. Within 30 calendar days of issuing the permit, the permittee must request and obtain the first inspection corresponding to the state of construction completed before the permit issued. All other inspections that would have been required at earlier stages must be requested and obtained within 30 calendar days following the initial inspection. After final approval of those inspections the permit becomes active and expires if work is suspended or abandoned for 180 days. The building official can require exploratory demolition, engineering evaluations, or third-party inspections, can grant no more than one extension of up to 30 calendar days, and can shorten the deadlines if the unpermitted work appears substandard or dangerous. Section 109.4 adds a special investigation with a fee equal to the permit fee.
Section 109.5 governs re-inspection. A re-inspection fee can be assessed when work is not complete at the time inspection is called or when corrections are not made. The section states it is not the intent to charge on the first rejection, but to control calling for inspections before the job is ready. Fees can also be assessed when the inspection record card is not posted, approved plans are not on site, access is not provided on the requested date, or work deviates from approved plans. No further inspection is performed until assessed fees are paid. Section 15.38.010 authorizes the building inspector to enforce all of Title 15.
Violations & Fines
Section 15.04.030 makes violating the Building Code chapter or failing to comply with its requirements an infraction. Section 1.16.030.B caps fines for City building and safety code provisions at $100.00 for a first violation, $500.00 for a second violation of the same provision within one year, and $1,000.00 for each additional violation within one year, with the fourth chargeable as a misdemeanor. Work started without a permit also draws the Section 109.4 investigation fee, equal to the permit fee, whether or not a permit is later issued.
Frequently Asked Questions
How soon must I get inspections if I built without a permit in Beaumont?
When does Beaumont charge a re-inspection fee?
How long is a Beaumont building permit good for?
Who can enforce building code violations in Beaumont?
Sources & Official References
Other rules in Beaumont
California rules heatmap·Compare Beaumont to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Inspections in Nearby Cities
How other cities in Riverside County handle building inspections.