Skip to main content
CityRuleLookup

Building Safety in Brookhaven, GA (2026)

6 verified building safety rules for Brookhaven, Georgia, sourced directly from the municipal code and official government pages.

Verified from official government sources

Fire Sprinkler Requirements

In the City of Brookhaven, Georgia, § 12-62 requires all new or substantially rehabilitated multifamily dwellings to be fully sprinkled under NFPA 13 or 13R, and all high-rise residential buildings to have an approved NFPA 13 sprinkler system. The section does not mention one- and two-family dwellings. The fire marshal and Community Development Department review and inspect.

Brookhaven, GA Fire Sprinkler Requirements

Significant Restrictions

Brookhaven Code § 12-62

(a)All new or substantially rehabilitated multifamily dwellings properties shall be fully sprinkled in accordance with the latest adopted edition of the National Fire Protection Association publications 13 (NFPA-13) or 13R (NFPA 13R).(b)All high-rise residential occupancy buildings shall have an approved sprinkler system installed in accordance with NFPA-13.

Childcare Center Rules

Section 27-625 of the Brookhaven Code sets the rules for day care in the City of Brookhaven, Georgia. Outdoor activity areas need a fence or wall at least four feet high, new day cares in RS, RSA or RM districts need 1,000 feet from another, and no permit issues without proof of state permits.

Day Care Center Rules in Brookhaven, Georgia

Some Restrictions

Brookhaven Code § 27-625

(a)Definition. ... Uses providing care and supervision for children or adults away from their primary residence for less than 24 hours per day.(1)Small day care. A day care use for six or fewer individuals.(2)Large day care. A day care use for seven or more individuals.(b)Supplemental regulations. The following supplemental regulations apply to day care uses. Unless otherwise expressly stated, ...

Building Permits

In the City of Brookhaven, Georgia, § 7-118 requires a permit before any construction, erection, alteration or repair to a building or structure, other than ordinary repairs. Detached accessory structures of 100 square feet or less are exempt. Starting without a permit adds a penalty of 100 percent of the usual permit fee.

Brookhaven, GA Building Permit Requirements

Some Restrictions

Brookhaven Code § 7-118

(a)Building permit required. A permit shall be obtained before beginning construction, erection, alteration or repair to a building or structure, mechanical system, gas system, plumbing system, electrical system, and energy conservation system, other than ordinary repairs. Permits shall be obtained before beginning work. Permits for emergency work shall be obtained within 24 hours after work is...

Electrical Permits

In the City of Brookhaven, Georgia, electrical work other than ordinary repairs needs a permit under § 7-118, and § 7-26 adds local rules to the state-adopted National Electrical Code. A residential service change triggers GFI upgrades, power disconnected for six months or more needs a reinspection permit, and electric fences need written special permission.

Brookhaven, GA Electrical Permit and NEC Rules

Some Restrictions

Brookhaven Code § 7-26

(2)Local supplemental ordinance requirements to the state-adopted National Electrical Code.a.Electrical fences consisting of an electrically charged conductor or other electrically charged devices shall be permitted to be used only for the confinement of farm animals. Only fence chargers of the intermittent current type listed by a nationally recognized independent testing laboratory shall be p...

Plumbing Permits

In the City of Brookhaven, Georgia, § 7-118 requires a permit before construction, alteration or repair to a plumbing system, other than ordinary repairs. Stopping leaks, clearing stoppages, and replacing sinks, faucets and water closets without relocating fixtures or piping need no permit. The Community Development Department issues permits and inspects the work.

Brookhaven, GA Plumbing Permit Requirements

Some Restrictions

Brookhaven Code § 7-118

A permit shall be obtained before beginning construction, erection, alteration or repair to a building or structure, mechanical system, gas system, plumbing system, electrical system, and energy conservation system, other than ordinary repairs. ... Permits shall ... not be required for the following: ... (5)Plumbing.a.The stopping of leaks in drains, water, soil, waste, or vent pipe, provided, ...

Building Inspections

In the City of Brookhaven, Georgia, § 7-170 requires permitted work to stay exposed until the building official approves each stage. Building inspections run from foundation and slab through framing to final, with separate electrical, plumbing, mechanical, gas and energy inspections. Work cannot go beyond an inspection point without approval.

Brookhaven, GA Building Inspection Stages

Some Restrictions

Brookhaven Code § 7-170

(f)Required inspections. The building official, upon notification, shall make the inspections set forth as follows:(1)Building.a.Foundation and slab inspection. To be made after trenches are excavated, forms are erected, and reinforcement is installed but before concrete is put in place. The appropriate silt and erosion control measures must be in place and functional. ... f.Framing (rough) ins...

Looking for DeKalb County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Brookhaven city rules.

Building Safety in DeKalb County →