Key Facts
- Governing section
- LDC § 10-4.3(H), Loading Area Requirements
- Minimum berth size
- 12 feet wide, 25 feet long
- Overhead clearance
- At least 14 feet required
- Tandem loading
- Not permitted under any circumstance
- Placement
- Cannot block right-of-way, aisle or parking
- Trigger for requirement
- New building, 50%+ expansion, or use change
Summary
Commercial loading berths in the City of Tamarac must be at least twelve feet wide, twenty-five feet long and have fourteen feet of overhead clearance under Land Development Code § 10-4.3(H). Tandem loading zones, where one truck must pass through another's space, are flatly not permitted, and loading areas must sit clear of any public right-of-way.
(2)Dimensional Standards for Loading Areas (a)Each loading berth shall be sized appropriately to accommodate the vehicles likely to use the loading area.(b)The minimum loading berth size shall be at least 12 feet wide and 25 feet long. ... (e)Each loading berth shall have at least 14 feet of overhead clearance.(3)Location of Loading Areas (a)Where possible, loading areas shall be located to the rear of the use they serve.(b)The loading areas shall be located adjacent to the building's loading doors, in an area that promotes its practical use.(c)The loading area shall be located and designed so vehicles using them can maneuver safely and conveniently to it from a public street or alley and complete loading without obstructing or interfering with any public right-of-way, parking space, dumpster facility, or parking lot aisle.(d)Tandem loading zones are not permitted.
Full Breakdown
Land Development Code § 10-4.3(H) sets the dimensional and location standards for off-street loading berths required whenever a Tamarac building is erected, expanded by fifty percent or more, or changes use, with the required count drawn from Table 10-4.4. Each berth has to be sized for the vehicles that will actually use it, with a floor of at least twelve feet in width and twenty-five feet in length; a property that expects semi-truck trailers must make its loading zone longer still to fit them, though the Director may allow a smaller or require a larger berth based on a development's particular characteristics.
Every berth also needs at least fourteen feet of overhead clearance. On placement, loading areas should sit at the rear of the use they serve where possible, next to the building's own loading doors in a spot that makes practical sense, and must be designed so trucks can maneuver into and out of them from a public street or alley without blocking a right-of-way, a parking space, a dumpster enclosure or a parking lot aisle. Tandem loading zones, meaning a configuration where a second truck cannot leave without the first one moving, are barred outright, with no exception listed in this subsection.
These loading standards sit alongside a separate drive-through stacking-space table for businesses like banks and restaurants, which is a distinct requirement covering customer vehicles rather than delivery trucks.
Violations & Fines
Building or using a loading area that is undersized, lacks the required overhead clearance, blocks a right-of-way or drive aisle, or is configured as a tandem zone violates the Land Development Code's off-street loading standards. Community Development reviews these standards at site plan approval, and Code Compliance can cite an existing violation to the Special Magistrate under Chapter 2, Division 2 of the Tamarac Code, where § 2-73.08 sets a $250.00 fine for a first offense and $500.00 for a repeat offense absent a more specific penalty.
Frequently Asked Questions
How big does a commercial loading zone have to be in Tamarac?
Are tandem loading zones allowed for a Tamarac business?
Can a loading area open directly onto a public street?
Sources & Official References
Other rules in Tamarac
Florida rules heatmap·Compare Tamarac to another location·View the Florida parking rules overview