Environmental Rules in Cocoa, FL (2026)
4 verified environmental rules for Cocoa, Florida, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Cocoa runs its drainage system as a stormwater utility created under Ord. No. 2-92, billing every developed and undisturbed property a monthly or annual fee based on impervious area. The base single-family unit rate is three dollars a month, and unpaid charges become a lien the city can foreclose like a mortgage.
Cocoa Stormwater Utility Fee Rules
Some RestrictionsCocoa Code of Ordinances §§ 22-81, 22-86
Sec. 22-81. - Creation. Pursuant to the home rule power of Article VIII, Section 1, Florida Constitution, and Chapter 166, Florida Statutes, and the powers granted in the Charter of the City of Cocoa, the city council does hereby establish a stormwater drainage utility and declare its intention to be responsible for the operation, construction, maintenance and repair of stormwater facilities; f...
Erosion Control
Cocoa requires a site development permit before clearing an acre or more of land, and no permit issues until the city engineer or building official approves an erosion and sediment control plan. The Construction Site Stormwater Runoff Control Ordinance, adopted by Ord. No. 09-2011, sets stabilization deadlines, sediment barriers and inspection triggers for every construction site in the city.
Cocoa Erosion & Sediment Control Rules
Some RestrictionsCocoa Code of Ordinances §§ 22-65, 22-67, 22-72
Sec. 22-65. - Short title. This subdivision shall be known and may be cited as "The City of Cocoa Construction Site Stormwater Runoff Control Ordinance." ... Sec. 22-67. - Permits. (a)A site development permit is required for land-disturbing activity that would require the clearing of at least one acre of land. No site development permit shall be issued without the approval of an erosion and se...
Flood Zones
Any development, alteration, or land-disturbing work wholly or partly inside a mapped flood hazard area in Cocoa needs a floodplain development permit before work starts, under the city's Floodplain Management Ordinance administered by the floodplain administrator.
Cocoa Floodplain Development Permit Rule
Some RestrictionsCocoa Code of Ordinances §§ 6-301, 6-322 (Floodplain Management Ordinance)
Sec. 6-301. - Scope. The provisions of this ordinance shall apply to all development that is wholly within or partially within any flood hazard area, including but not limited to the subdivision of land; filling, grading, and other site improvements and utility installations; construction, alteration, remodeling, enlargement, improvement, replacement, repair, relocation or demolition of buildin...
Flood Elevation Requirements
Cocoa's local amendment to the Florida Building Code, Residential requires new homes in flood hazard areas to elevate their lowest floor to at least one foot above base flood elevation, a foot higher than the state's baseline floodplain standard.
Cocoa's Base Flood Elevation Plus One Rule
Some RestrictionsCocoa Code of Ordinances § 6-105 (local amendment to Florida Building Code, Residential R322.2.1)
R322.2.1 Elevation requirements. 1.Buildings and structures in flood hazard areas not designated as Coastal A Zones shall have the lowest floors elevated to or above the base flood elevation plus 1 foot or the design flood elevation, whichever is higher.2.Buildings and structures in flood hazard areas designated as Coastal A Zones shall have the lowest floors elevated to or above the base flood...
Looking for Brevard County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Cocoa city rules.
Environmental Rules in Brevard County →