Grand Junction, CO Parking Rules: EV Charging (2026)
Key Facts
- Governing section
- GJMC § 21.08.030
- Trigger
- New multi-unit or nonresidential parking lots
- Redevelopment trigger
- 65%+ gross floor area increase
- Standard applied
- Colorado Model Electric Ready and Solar Ready Code
- Review point
- Site plan / building permit stage
- Enforcement
- Stop-work plus civil penalty up to $10,000
Summary
New development and qualifying redevelopment of multi-unit or nonresidential buildings in Grand Junction must wire permanent parking lots and structures for electric vehicles. GJMC § 21.08.030 ties the mandate to the Colorado Model Electric Ready and Solar Ready Code and triggers on any redevelopment expanding a building's gross floor area by 65% or more.
Where a permanent parking lot or structure is required for new development or the redevelopment of multi-unit dwellings or nonresidential uses, the lot or structure shall be provided with electric vehicle power transfer infrastructure in compliance with the Colorado Model Electric Ready and Solar Ready Code. For the purpose of this section, redevelopment shall include the replacement or addition of dwellings units or redevelopment or expansion that results in a 65% or greater increase of the gross square footage of an existing structure.
Full Breakdown
Section 21.08.030 of the Zone and Development Code, added by Ordinance 5190 in December 2023 and amended by Ordinance 5267 in July 2025, requires electric vehicle power transfer infrastructure whenever a permanent parking lot or structure is required for new development. The mandate reaches two categories of project: new construction of multi-unit dwellings or nonresidential uses, and redevelopment of the same use types. The code defines the redevelopment trigger precisely: a project counts as redevelopment for this section if it replaces or adds dwelling units, or if it expands an existing structure by 65% or more of its gross square footage.
Projects below that 65% threshold, and single-unit detached or duplex construction, fall outside the requirement. The infrastructure itself must comply with the Colorado Model Electric Ready and Solar Ready Code, which Grand Junction separately adopts with local amendments under GJMC Chapter 15.42, so builders need to check both the zoning section and the adopted building-code chapter for wiring, conduit and panel-capacity specifics. Because the requirement sits in the parking chapter, it is reviewed at site-plan and building-permit stage by Community Development rather than left to inspection after the fact; a project that omits the required EV infrastructure cannot receive Planning Clearance or building permit sign-off until the plans are corrected.
There is no exemption in the text for cost or site constraints; the only carve-outs are the redevelopment-size threshold and the residential unit types excluded from the underlying parking-lot trigger.
Violations & Fines
Failing to provide the required electric vehicle infrastructure blocks Planning Clearance and building permit approval outright under the site-plan review process. If work proceeds without it, the City can treat the omission as an unlawful development under GJMC § 21.13.030, issue a stop-work order under § 21.13.050(a), and pursue a civil penalty of $100 to $1,000 per day, capped at $10,000, under § 21.13.050(c).
Frequently Asked Questions
Does Grand Junction require EV charging wiring in new apartment buildings?
Does remodeling an existing building trigger the EV requirement?
Does the EV charging rule apply to single-family homes?
Who checks compliance with the EV charging requirement?
Sources & Official References
Other rules in Grand Junction
Compare Grand Junction to another location·View the Colorado parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.