Pontiac, MI Parking Rules: EV Charging (2026)
Key Facts
- Trigger
- More than 8 petroleum dispensing pumps
- Requirement
- At least 1 EV charging station
- Multi-hose islands
- Counted as multiple pumps
- Applies to
- Newly constructed filling stations, site plan
- Section
- Zoning Ordinance § 2.509(B)(6)
Summary
In the City of Pontiac, any automobile filling station with more than eight petroleum dispensing pumps must include at least one electric vehicle charging station. Zoning Ordinance Section 2.509(B)(6) counts a multi-vehicle fueling island as multiple pumps for purposes of hitting that eight-pump threshold.
6. All automobile filling stations with more than eight petroleum dispensing pumps must include at least one electric vehicle charging station. A petroleum dispensing pump is defined as the individual unit which dispenses petroleum-based fuel into a vehicle. A petroleum dispensing pump island that can dispense petroleum-based fuel to more than one vehicle at a time shall be counted as multiple pumps depending on how many vehicles can be fueled at a single time for purposes of this subsection (B)(6).
Full Breakdown
Pontiac's Zoning Ordinance regulates automobile filling stations in detail under Section 2.509(B), covering setbacks, separation from other stations and the R-1 District, truck turn analyses, landscaping, and lighting. Tucked into that list, Section 2.509(B)(6) requires any filling station with more than eight petroleum dispensing pumps to include at least one electric vehicle charging station as part of its site plan. The ordinance defines a petroleum dispensing pump as the individual unit that dispenses petroleum-based fuel into a vehicle, and it specifically addresses multi-hose fueling islands: an island capable of fueling more than one vehicle at a time counts as multiple pumps, based on how many vehicles it can serve simultaneously, when determining whether the eight-pump threshold is crossed.
This means a station cannot avoid the EV charging requirement simply by building fewer physical islands with more nozzles each. The requirement sits within the same subsection that requires newly constructed filling stations to submit a traffic impact study and a truck turn analysis with their site plan, all reviewed by the Planning Commission as part of site plan approval. Existing filling stations that predate the current ordinance and do not meet this or the other Section 2.509(B) standards are treated as lawful Type B nonconforming uses under Article 6, Chapter 5, and are not retroactively required to add a charger unless they expand or reconstruct in a way that intensifies the nonconforming use.
Violations & Fines
A newly constructed or expanded automobile filling station with more than eight petroleum dispensing pumps that omits the required electric vehicle charging station fails site plan review under Section 2.509(B)(6) and is subject to the Zoning Ordinance's general civil infraction penalties in Section 6.706, a minimum $100 fine plus costs for each day the noncompliance continues once identified.
Frequently Asked Questions
Do all Pontiac gas stations need EV chargers?
How does Pontiac count pumps at a multi-hose fueling island?
Does an existing Pontiac gas station have to retrofit an EV charger?
Sources & Official References
Other rules in Pontiac
Compare Pontiac to another location·View the Michigan parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
EV Charging in Nearby Cities
How other cities in Oakland County handle ev charging.